AnsweredAssumed Answered

How to link the drawing with the coressponding parts and assemblies after the creaction of the project into the vault ?

Question asked by Hardik Patel on Aug 4, 2015
Latest reply on Aug 5, 2015 by Hardik Patel

Hello everyone,

 

We are new to Work-group PDM. We've stuck with one minor problem. The problem is we have already created a project into the vault for the ongoing project, now we'd forgot to add corresponding drawings for these parts and assemblies. So can anybody tell me how we can add the drawings of the corresponding parts and assemblies after the creation of the project into the vault.

 

Thanks,

Outcomes