AnsweredAssumed Answered

Use the Task Scheduler to Update Design Studies

Question asked by James Mulhern on Jul 31, 2015
Latest reply on Aug 6, 2015 by Janko Stellaard

I have two design studies to run in different parts and I would like to run both of them overnight, because they take a long time to compute.  Is there any way to run them via the Task Scheduler.  I used the "Update Simulation" tool in the scheduler last night and that only ran the individual stress/thermal studies and did not update the Design Studys.  Any help would be appreciated.  Thanks.

 

-James

Outcomes