I am just curious if anyone sees the "ability" to check a
part into the Data Vault while it is in a rolled back condition a
problem. From my standpoint, only fully updated parts should be
checked in, and there are a variety of reasons for this, including
file releases. We can automate a part to be checked out of the
vault and an STL, STEP etc file created and sent automatically to a
tooling vendor....OOOPSSS, the part was rolled back and only gave
that aspect of the part in an exported format...No biggy right?
Should have clarified, this is in PDMWorks Workgroup 2007, SW2007 SP4.0
Should have clarified, this is in PDMWorks Workgroup 2007, SW2007 SP4.0
if you save the part dosen't it roll forward?