1 Reply Latest reply on May 17, 2015 3:12 AM by Deepak Gupta

    Task Schedudler

    Andrew Wylam

      Can you re run the same task   I am trying to see if you can run the batch print option 

      I need 50ish  drawings in a set (not always  all  the drawings in the folder) 

      this is at the start of the project  Then at a later date i need to re run the print run same drawings  as before

      do  i need to re run the task or can i just copy and save  the old task or do i need to reset it up again

      or can i save a task then re run it at a later date?

       

      Cant see anything in the help files

       

       

      Thanks Andrew