AnsweredAssumed Answered

Can I keep only one Revision of everything in my Vault?

Question asked by Frank Pue on May 7, 2015
Latest reply on May 8, 2015 by Frank Pue

Whenever we check in the revised drawing or model into the PDM Vault, the revision is updated. Our system is getting too big and too slow because the PDM system keeps every revision. Since we never need to use the older revision of the design, we decided to delete all of the older revision for all drawings and models, only keep the most recent revision (which means only one revision in PDM vault).

 

For the future design, we also decide to automatically overwrite the older revision and keep only one revision whenever we check in the revised design. Is there anyone can tell me if it is possible, and how to set up in our PDM system?

 

Thank you very much!

Frank

Outcomes