AnsweredAssumed Answered

How many revision schemes are available in Enterprise PDM ?

Question asked by Chris Stewart on Apr 21, 2015
Latest reply on Apr 27, 2015 by David Heverin

I am starting at a new company that has 4 revision schemes; Prototype / Engineering, Controlled Engineering, Controlled Commercial & Controlled Sustaining Engineering.

I am tasked with setting up the PDM system. I am familiar with Workgroup PDM and would like to use it, but it only handles 3 revision schemes (primary, secondary and tertiary). Does Enterprise PDM allow for 4 revision schemes ? My other option is to get the company to buy into using only 3 revision schemes.

 

Thanks,

Chris

Outcomes