Hi,
Attached image shows my working scenario. I know this topic has been already explained in different ways, but I am still looking for better answers.
I don't want part revision roll up to a top assembly.
When I want to change something in a part, I just check-out a part and change and check-in back to the vault.
But when I want to create part list using vault's reporting feature, it doesn't show latest revision in revision field of corresponding part.
Please follow attache image for more info.
is it not a practice what I am trying to do i.e. not rolling up part revision to top assembly? OR
is it WPDM's limitation?
Thank you,
Reeshi
Solidwork 2012
WPDM 2012
I guess the information that is displayed in the Reporting area is pulled from the top assembly, and until the assembly is rebuilt with the new rev parts and checked back in it won't have the latest revisions. It would be nice if there was a way to "refresh" the assembly in the vault instead of needing to check it out and then check it back in.