AnsweredAssumed Answered

Is it possible to setup Workgroup PDM to mangage a specific set of drawings?

Question asked by Bill Howell on Aug 26, 2014
Latest reply on Aug 27, 2014 by Myles Bryning

I have two engineering teams, team 1 wants to use PDM to manage their drawings, teams two does not.  Is it possible to setup PDM to manage a specific set of drawings for
team 1 leaving team 2 drawings unmanaged?     All drawing reside in the same folder structure \\Server\Engineering\Drawings\ Many different folders.

Outcomes