We deal with very large part files (up to 1Gb/file) which
make it impractical and sometimes impossible to check in to
PDMWorks. I am considering instead to have each designer save out
parasolid at the end of the day and check-in this much smaller file
instead. Actually, its the only solution I have come up with and I
hope to implement it soon.
Does anyone have experience interacting with PDMW in this manner? Have you run into any headaches?
Regards, Matt
Does anyone have experience interacting with PDMW in this manner? Have you run into any headaches?
Regards, Matt
test your idea to see the results.