I have a standard product and am looking to have a bill of materials that if the Assembly Quantity is changed from 5 to 10 the quantities in the bill of materials are adjusted.
Ideally i would have 2 columns. The first column would be the Quantity of a Single Assembly. The second column would be for total parts required for the build.
This would allow me to use the BOM as more of a work order.
Any help would be great.