We have EPDM installed. Permissions are set up, etc. Our issue is the techs on the floor are able to see our ECO DEVELOPMENT part of the work flow. I'm I crazy or, through permissions, they should only be able to see RELEASED drawings. The drawings in ECO only engineering should see and they should be able to work with the RELEASED drawings still as needed?
Are there permissions set up in say the Workflow that are superceding other permissions and making them void?
Dumb question?
in search results you may see the state showing the latest state but the user may not be able to "get latest", have you verified that that they can actually "get latest"?