Is it possible to move configurations up and down the tree? I have a number of stages listed for assembly of a mechanical part, when I get to stage 10 it puts it under stage 2. Im using SW2011 SP 4.0 x64. Thanks !
Is it possible to move configurations up and down the tree? I have a number of stages listed for assembly of a mechanical part, when I get to stage 10 it puts it under stage 2. Im using SW2011 SP 4.0 x64. Thanks !
The old 01, 02, 03, etc.