Hi,
I have a large assembly Im tring to route.
I've added lots and lots of routes and its gotten to the point every time I have to edit the route using Auto-Route, it can take several minutes to add a line from one component to the other.
I can see it says "Updating Guidelines" for a few minutes..
I think the problem is not the large assembly but rather the complex route. Is there a way to speed it up a little?
Im using SW2012.
Thanks
Hello Dotan,
Indeed, I think the problem is the number of parts in your assembly and the number of mates. That is the case for me. I suggest to try with the following options:
Furthermore, there is a solidworks configuration option that I suggest to dissable. It is something like "updating assembly when switching to assembly´s window". Set it to ask or not to do. Otherwise, everytime you change windows, it will take 2 minutes to refresh.
Hope it helps.
Regards.