Hi everyone,

 

Please note that I have 10C cable and each core connecting each terminal blocks. Those terminal blocks are in different elevations in panel.

 

I have created route path for cable and routed cable. The problem is after entering the panel cable cores are not routing as per defined path!!!

 

Route has been taken automatically and I am having around 20 cables like that, it become 200 cores from cable glands to terminal blocks inside the panel.

 

is there any option to define route these cores of cable??? or anyother possibilities?

 

I am using solidworks electrical 2013.

 

Please help!!!!!!

 

I will be very grateful please

 