1 Reply Latest reply on Feb 6, 2014 3:07 PM by Joy Garon

    Lock transition of files

    Ronnie Rasmussen

      Hi all,

       

      Is it possible to lock the transition (release) of a drawing if the part is not already released or at least released simultaneously? And vise versa when making a new revision?

       

      It must be possible to release the part without the drawing and also making a revision on the drawing without the part.

       

      Anyone having a suggestion?

       

      Thanks in advance,

      -Ronnie