Have a user that bumped the revision on checkin primary level. (a to b) The part is not released. I know as a admin I can change the revision back to A with out changing the part. (keeping the changes.) I can not remember how to do this. The other question is can I also change the secondary revision too? a001 back to A? And how do I do this?
If admin can permit or has permitted already then you can simply rollback to previous revision. I don't have have WPDM installed but you can ask the admin to set the option. Finally ask the user to right click on the file in WPDM and select rollback. In the drop down menu select the revision.