I'm currently working on a drawing for a fairly complex weldment. All of the welds are 1/4" fillets and all the parts will be welded at every point possible. Instead of calling out the same weld for different parts several times, is there a way to properly call out the entire weldment ("weld all available joints with a 1/4 fillet")?
Welcome to the forum. I don't know if it's according to any standard, but the screenshot below is probably what I'd do.