Preview | SOLIDWORKS USER FORUM
Use your SOLIDWORKS ID or 3DEXPERIENCE ID to log in.
DFDerek Feng31/10/2013
Can parametric study use 'take previous results'?
Looks to me parametric study is just an easy way to create multiple projects. Does that mean it is not able to use results from previous case? Because if the variations are small, it would help reduce the calculation time if results from previous project was used.
I did a test case and it didn't look like previous results were used. But I would to like to get confirmation on that.
Thanks.