AnsweredAssumed Answered

Need help

Question asked by Shakir Saeed on Apr 17, 2013
Latest reply on Apr 20, 2013 by Shakir Saeed

Hi guys,

 

what are the correct mates for belt and shafts to make a correct conveyor belt

i attached my design.

 

when i designed the belt i did normal extrude boss and cut for a rectangular and two arcs at the both ends of the rectangular. then,

in assymbly i used chain belt command to connect both shafts together. is it correct?

Attachments

Outcomes