3 Replies Latest reply on Mar 6, 2014 5:26 AM by Nurhidayah Aziz

    EPDM Export BOM during Transition

    Todd Becker

      I am looking for help trying to export a BOM duing a workflow transition. I understand HOW to do it, but what I am looking for help on is only triggering the BOM based on a data card variable.

       

      For Example; I have 3 assemblies that I am releaseing to our shop. One of those assemblies has the vairable "subassembly" set to YES which means that the BOM on that drawing needs to be exported to the purchasing group. How can I trigger this to happen during a transition? I thought it was on the variable tab of the Export Rule page.

       

      EPDM 2013 SP2.0

       

      Thanks.

      Todd