1 Reply Latest reply on Mar 30, 2013 1:06 PM by Jerry Steiger

    How To Link Approved Column in Revision Block to PDM Workgroup Check In Dialog

    Tiny Freeman

      In PDM Workgroup, when one checks in a file and sets the note in the check in dialog, the revision note is automatically entered in the revision block in the drawing. How does one go about linking an approved column in the revison block so that the user can enter their initials in the check in dialog and have it automatically entered into the revision block?

       

      Thanks in advance.