AnsweredAssumed Answered

Problem with costing template

Question asked by Xavier Simon on Mar 14, 2013

hi guys!

 

I have a problem with costing template.


When I want to do a personalized template, I change all parameters with my dates, but when I try to change the depth cut, SW don't change the costs.

 

One example of my test, with dates highly exaggerated:

 

Diameter tool(mm)Advance (mm/r)Cutting speed(m/min)Depth cut (mm)C MaerialC FabricationC Total
10---1,968,7510,71
200,12545,721,5241,960,462,42
50---1,960,182,14
-0,05--1,961,153,11
200,12545,721,5241,960,462,42
-0,2--1,960,292,25
--30-1,960,72,66
200,12545,721,5241,960,462,42
--60-1,960,352,31
---0,51,960,462,42
200,12545,721,5241,960,462,42
---31,960,462,42

 

Thanks

Outcomes