AnsweredAssumed Answered

Dealing with equations

Question asked by Brad Haubrich on Mar 8, 2013
Latest reply on Mar 8, 2013 by Jeff Holliday

I have an interesting problem.

Too many equations in a part bogs down the system.

I use librairy parts that have complex equations attached.

The more features I use the slower I go. On some parts there is an excess of 150.

Can I suppress or freeze them so I don't have to wait for the system to rebuild the whole list.

At times that can be 13 minutes.

 

Thanks in advance.

Outcomes