Is is possible to start a drawing BOM with Item 1 and then skip to Item 100 and continue with 101, 102, etc.? For example, we list parts designed and fabricated by us as items 1-99, and hardware as 100 to 199. A typcial BOM might have items 1, 2, 3, 4, 5, 100, 101, 102.
One method is to add extra rows into the BOM table between these items and then hide those rows, however that is not a very practical work-around due to the volume of rows required.
Roger,
Welcome to the forum.
Take a look at this excerp from the help file.
http://help.solidworks.com/2012/English/SolidWorks/sldworks/HIDD_DVE_INSERT_BOM.htm
Specifically here