AnsweredAssumed Answered

Pack & going and using equation from 2011 in 2012

Question asked by Joseph Nagle on Jan 9, 2012
Latest reply on Mar 22, 2012 by Joseph Nagle

When using a pack & go in SW12 I can't get the equations to update with the job number. when pack & go I will replace a prefix of XXXXX with the job number. The job number will not update in the equations. If this happened in SW11 I could go through and copy and paste the job number in less then 5 minutes but with the new format of equations it is taking 3.5 minutes to change one equations and i have about a 100 equations to change. That will be over 5 hours of work to do something that should be automatic.

 

Anyone else have this problem and a way to fix it?

Outcomes