Ok, so I have a part that is up to Rev J and a drawing of it which is up to Rev C. I want to view Rev B of the drawing. When I check the drawing out of the vault I choose rev B for the drawing and What do I choose for the Rev of the part? And what do i select in the "As built , latest revision or latest available revision" area? I can't find this explained clearly anywhere.
IMHO, you have an issue with your procedure.
If the model changes the drawing should logically change.
You should have identical revisions for both model and drawing throughout the history.
As built = snap shot of drawing & model revisions at the time they were checked in.
When checking out a drawing select as built, then select the rev of drawing you want.
Watch the revision column of the model, it should change.
When you see the model revision change that is the revision the model was at when the drawing was checked in.
In the example below when drawing Rev B was checked the model was at Rev D.
IMPORTANT NOTE:
the model should never be ahead of the drawing.
The drawing can be ahead of the model but NOT vice versa.
Model Drawing
A A
B
C
D B
E
F
G C
H
J
Better method;
Drawing Model
A A
B
C
D B
E
F
G C
H
J
Even better method;
Drawing Model
A A
A.01
A.02
B B
B.01
B.02
C C
C.01
C.02