I am trying to find out if I can call the current revision in the Workgroup PDM to be used in a drawing? I want to do this through custom properties. If this is possible could someone please give me the steps to this. I have done some searching through the forums and have not found how to do this.
Thanks for all your help
Keith
Keith,
It has been a while since I have done it, but you need to setup the revision
schemes in the vault admin tool.
If you look at this link from the help file it shows you about half way down
how to setup the revision on the drawing.
PDM Workgroup drawing revision
PDM Workgroup revision scheme
PDM Workgroup Vault Settings
Hopefully this will help you.