1 Reply Latest reply on Aug 6, 2006 12:44 AM by

    FloWorks calculation

      Solidworks thinks you changed the geometry of the part and Is making you remesh the part.
        • FloWorks calculation
          After I have run a calculation and shut it down for the day, the next day I wanted to contine the calculation but this option is greyed out. Have a look at the picture attached below. I have not had this problem before.

          Wayne