Hello everyone,
I have been setting up PDMW for my company and came across a couple issues with the revision table that I cannot seem to resolve on my own.
Problems:
1. When I check in a drawing of the first time it automatically creates a new row in the revision table with the revision A. I don’t want it to start creating rows in the table until revision B. Otherwise, the revision A row will always say “Drawing Released” for all drawings. Is there a way to fix this?
2. Is there a way to map approvals for the revision table? For example, if I want each revision to be approved by Engineering and Manufacturing, then the approving person from each division could type something into a mapped field and it would appear in the revision table. I have attached photos for clarification. Is this possible?
Thanks,
Tara
1) no
2) no
been broken for a long time.
your best bet is to fill out table before checking in.
make sure to disable the rev table in pdmwadmin.