AnsweredAssumed Answered

Revision Table Auto-update

Question asked by Tara Campese on Jun 9, 2011
Latest reply on Jun 13, 2011 by Michael Wallom

Hello everyone,

I have been setting up PDMW for my company and came across a couple issues with the revision table that I cannot seem to resolve on my own.

 

Problems:

1. When I check in a drawing of the first time it automatically creates a new row in the revision table with the revision A.  I don’t want it to start creating rows in the table until revision B.  Otherwise, the revision A row will always say “Drawing Released” for all drawings.  Is there a way to fix this?

2.  Is there a way to map approvals for the revision table?  For example, if I want each revision to be approved by Engineering and Manufacturing, then the approving person from each division could type something into a mapped field and it would appear in the revision table.  I have attached photos for clarification.  Is this possible?

 

Thanks,

Tara

Attachments

Outcomes