AnsweredAssumed Answered

Revision Control for Parts

Question asked by Emil Tietje on Mar 24, 2011
Latest reply on Mar 25, 2011 by Jiral Parikh

We use PDMWorkGroups to control drawing that are both under development and issued.  Recently we have come across an interesting revision control issue.  I have seen it both years ago with paper (giving away my age).  There was an assembly that had several parts, one of which was a part rev A.  A second assembly was desgined which just a little different, but used a Rev B of the same part.  The first assembly always has to use part Rev A and the second assembly has to use part Rev B.  Will PDMWorkGroup understand the different and replace part Rev A with part Rev B?

 

I realize a better method would be to use different configurations.  Rev B could be the addition of the second configuration.  We could just change the configuration between the two assemblies.  Unfortunately it was not done that way.

 

Thanks,  David Tg