Not sure what I'm doing wrong but I added a new configuration in Sheet metal and when I change the values in the second config the values changes in the first config also. I've done this many times with regular parts but I'm not sure why I can't do it in Sheet metal. Is there a setting somewhere to do with configuration? I have linked values and I edit the value in the equation field. My goal is to have variable values for A, B and C and save them in different configurations. Any information will help.
Mukesh,
Which value is the one that you want to change? I think you just to tell it to be configurarion specific, when you double click the Dimension change the setting at the right of the pop-up.