I have a complex assembly, one sheet can't fit BOM and the assembly with explode view, so I would like to put them on deferent sheet, but didn't work. I don't why. Anybody can solve this problem?
I did same thing before, but I would like get better way to do it. I got it from Scott, just drag the BOM to the sheet tab you want to move to. it is very ease, you can try it, very good function.
Ping,
In you unachor you BOM, grab it in the upper left corner and drag it to sheet 2
Or you can grab it in the feature manager and drag it from one sheet to the next.
Also as a side note, if your BOM is really large you can also split the BOM into 2.