AnsweredAssumed Answered

ADDING REVISION BLOCK THROUGH TASK SCHEDULER

Question asked by Ruben Narvaez on Jan 25, 2011
Latest reply on Jan 25, 2011 by Ruben Narvaez

I have about 200 drawings that I need to revise because of one dimensional change.  Our drawings have revison blocks.  Is there anything that I can do to automate this process in some way through task scheduler or something?  The actual text in the revison will be the same and about 95% of the revisions will be going from A to B.  Any suggestions will be very much appreciated.

 

Ruben

Mechanical Designer

Outcomes