    Problems with static study of mobile crane

    Bart Zuidhoek
      Hi all,

      I am currently working on a simulation study on a mobile crane. This for my thesis.
      To simplify the model I have unnecessary elements such as the crane itself and engine + accessories removed from the analysis. Compounds such as welds and bolts and nuts are also not included in the simulation. These were replaced by rigid connections. Furthermore, all steps - joints were defined, the materials were introduced, and crushing forces were determined, ...
      According to the program the mesh was ok. The problem arises in the study. After a waiting period of 20 hours (!) has shown a progress of 40% at "forming surface to surface bonding. I think this is only part of the overall study, which still stands at 0%. Now I wondered whether this is normal procedure.
      How I can simplify the design?
      Thanks