Referenced Documents - Order of processing

Question asked by Barry Stump on Aug 4, 2010
Latest reply on Aug 5, 2010 by Barry Stump

OK so you have an ECN with referenced drawings attached.  The drawings themselves also reference their parts or assemblies (anything changed).  Whal order does this get processed?  Is there a good way of holding the final state changes untill the final is approved so that the part or assemblies can be forced to take their drawing revisions (and states).  Basically all or nothing?