AnsweredAssumed Answered

Syncing up test workflow with production workflow

Question asked by Mike Ramsey on May 12, 2010
Latest reply on May 17, 2010 by Tor Iveroth

Is there an easy way to sync up my test vault workflow with the production one? We're looking into some workflow improvements and want to play with them in our test vault first. The problem I'm having is I can't overwrite the workflow in the test vault even though they have the same name. I get a new workflow called Production (2) instead of Production. I've tried a drag and drop also I've tried to export the workflow out and import in with the same results. 

Outcomes