AnsweredAssumed Answered

Reporting Assembly using "Latest Revision"

Question asked by Stephen Ball on Mar 31, 2010
Latest reply on Apr 1, 2010 by Kenneth Barrentine

Hi everyone,

 

I am trying to figure out how to use the reporting feature of the Workgroup PDM software.  Is there a way to generate a report for an assembly using the "Latest Revision" type of option (i.e. similar to checking out with the "Latest Revisions" option)??  As far as I've been able to see, reports are generated "as built".

 

Thanks for the help!

 

Stephen

Outcomes