I am currently designing a mezzanine floor area using a combination of UC, UB sections, SHS and RHS. It is designed in modular sections for ease of fabrication, transport and site installation/handling using seperate weldments. It would be of great benefit to have a total length of materials used on a job, ie, a consolidated list of all materials, rather than having to check through each cutlist to determine the total length of materials required (meters of UC, UB, SHS, RHS)
I would appreciate any suggestions.
DMcT
I am currently designing a mezzanine floor area using a combination of UC, UB sections, SHS and RHS. It is designed in modular sections for ease of fabrication, transport and site installation/handling using seperate weldments. It would be of great benefit to have a total length of materials used on a job, ie, a consolidated list of all materials, rather than having to check through each cutlist to determine the total length of materials required (meters of UC, UB, SHS, RHS)
I would appreciate any suggestions.
DMcT
If you select the weldment cutlist in the drawing and 'Save As...'a CSV file, this will allow you to open it in excel. You canthen cut & paste the other CSV files into one master file andsub-total it.