1-J6CI3I

drawing revision out of sync with part revision

Discussion created by 1-J6CI3I on Jul 1, 2009
Latest reply on Aug 6, 2009 by John Matrishon
I am noticing that if I have a part already checked in the vault before I create a drawing and then check in the drawing the drawing does not have the same revision as the part. I have used dbworks in the past and the drawing revision was always sycronised with that of the part. Am I missing a setting in the vault admin?

Outcomes