AnsweredAssumed Answered

How to generate customised report in workgroup PDM

Question asked by 1-J5WVT on Jun 30, 2009
Latest reply on Jul 1, 2009 by 1-YJ1IM
Dear ALL,

We are using Workgroup PDM 2009 sucessfully since last three months. Now we are very stable with the data. Now I need to generate customised report based on request from our engineering department. I tried the report generation system og Workgroup PDM, its not very detailed and flexible. It just generate a normal report.

Does anyone knows some tool or a method by which report can be generated based on details required. For. E.g. To generate a report where creator of the drawing is John and are revised by anyone in the month May 09.

Regards
Jay Doshi

Outcomes