Hi, I am migrating SolidWorks data into a PDM 2019 system. The PDM system is overwriting (actually adding) a date field to all of my drawings as I add them to the system. See the attached pic. The RED rectangle is the date that PDM is adding to my drawings (the date is always the current day, whatever that might be). The Green rectangle is the correct date that I would like preserved in the drawing. I'm sure that this is a parameter that needs changed, I only need to know where it's at.
I don't see how PDM could add a field to a drawing file. What custom properties is that field mapped to. I suspect that the drawing was mapped to two different custom properties, but one was always blank before PDM.