AnsweredAssumed Answered

SolidWorks 2019 PDM date issue

Question asked by rodney mansfield on Jul 10, 2020
Latest reply on Jul 15, 2020 by rodney mansfield

Hi, I am migrating SolidWorks data into a PDM 2019 system. The PDM system is overwriting (actually adding) a date field to all of my drawings as I add them to the system. See the attached pic. The RED rectangle is the date that PDM is adding to my drawings (the date is always the current day, whatever that might be). The Green rectangle is the correct date that I would like preserved in the drawing. I'm sure that this is a parameter that needs changed, I only need to know where it's at.

Attachments

Outcomes