AnsweredAssumed Answered

how to increase maximum number of time increment in dynamic simulations?

Question asked by Sadegh Fffff on Jun 27, 2020

i'm doing a research on a topic with several load and boundary conditions. my total time is 30s and I need at least 0.001 time step to achieve an accurate result. however the solidworks simulations has a limit on simulation steps (which is 15000) and if i run the simulation it will break at this specific number.

is there any way to increase this maximum limit and solve my entire problem?

if no, any other suggestions is highly appreciated.

Julien Boissat

Greg Jankowski

Outcomes