AnsweredAssumed Answered

How to change convergence sensitivity

Question asked by Brendan Murphy on Dec 9, 2019

I am running a batch of simulations that I intended to leave running overnight.  When I came back I found that they had not finished because each simulation was not finishing becauseeither the convergence criteria were incredibly small  values (~0.01deg F) or in some cases the number of iterations the average was taken over was too high (~150 iterations).  

 

How can I change the settings for automatically determining convergence criteria to decrease increase the criterion values or decrease the number of iterations an average is taken over?

Outcomes