I'm losing my damn mind right now. I have a fairly large route that was almost perfect...
Well, I had to add in some splits for grooved connections and/or field welds.
Now EVERY. Single. Piece... on either side of these route splits have changed to Schedule 10.
There's no reason for this. Not one. My entire route is Schedule 40. The route properties are set to Schedule 40.
There are no fittings that aren't Schedule 40. But CONSTANTLY Solidworks decides to just start changing pipes to the lowest schedule option on the pipe configuration. It's a problem with almost every route I've done.
Usually I can just use "Change Route Diameter" but this time it decides that the pipe is already set to Schedule 40, so I can't change it.
This shit is getting ridiculous. Does anyone involved in development give 2 shits about making routing work?
This is more of a rant than looking for help. But if there's a workaround other than faking the description in the BOM of 50 parts, I'll take it.