AnsweredAssumed Answered

Revision consistency.

Question asked by Daniel Melendez on Nov 12, 2019

Hi all dunno if this has been asked before. I have a solidworks drawing (drw) in PDM. However that drawing is terrible but to update it will take forever. I checked the drawing out and saved as copied a good drawing with this drawings name/number. Even though I added the current rev level, when I push it through pdm it gives me an 'A' revision. What is a better way to do this without interrupting the revision level process/flow? 

Outcomes