Richard Wagenaar

Solidworks 2016 vs 2020 rebuilding time 2000 parts assembly

Discussion created by Richard Wagenaar on Oct 13, 2019
Latest reply on Nov 8, 2019 by Alin Vargatu

I tested the same assembly with 2000 parts both in SW2016 and SW2020. Change a part and after that measure the time to rebuild the assembly.  Of course I saved the parts first in SW2020 before testing.

 

SW2020  25 sec

SW2016  20 sec

 

From reading the news about 2020 I had the impression we would make a big step forward but it is a big step backwards.  This is 25% longer rebuilding time .

Outcomes