AnsweredAssumed Answered

Is there any way to schedule Copy Tree?

Question asked by Martin Malmqvist on Sep 16, 2019
Latest reply on Sep 16, 2019 by Jerome De San Nicolás

I want to make a daily copy of all .stp and .pdf-files to a location outside of the vault. The best way I've found so far is to manually perform a Copy Tree (right-click on the vault view), apply the right filters and settings and start the copying. Is there any way to schedule this to be performed automatically every day? I have Solidworks PDM Standard.

Outcomes