Did I miss something in "What's New in Solidworks" or did
route sketch relations change? I used to add a fitting and the 3D
sketch path would snap along x, y or z.
Now I get a collinear and/or parallel relation depending on the pipe fitting. This is not the most critical issue I've encountered with SW 2009 but I liked all my 3D sketchs being defined in the three coordinate directions if I so desired.
Thanks in advance for any feedback...
Now I get a collinear and/or parallel relation depending on the pipe fitting. This is not the most critical issue I've encountered with SW 2009 but I liked all my 3D sketchs being defined in the three coordinate directions if I so desired.
Thanks in advance for any feedback...
If this behaviour has changed it isn't a planned change. Sometimes we get affected by changes in assemblies or sketch code (or even changes we make ourselves!). As you say, this shouldn't be critical but I too would much prefer it to use the simplest constraint system possible. I'll get someone to take a look.
Thanks
Andy