I am trying to use the Scheduler to export all my drawing to PDF.
I update all my solidworks drawing and everything looks great in solidworks.
I then run the Task Scheduler to export the pdf files and it runs.
I then review the PDF files and they look like junk!!!! All my updated are gone.
The views are out of date. The properties are wrong. It looks like I have never
edited the drawing.
Then I go back to solidworks and call the drawing up and everything look great.
So my question is " Where is solidworks getting all the bad files from??"
Why is the Scheduler calling up old files for god know were?
Without looking at more details it would be hard to say anything but I've seen issues with saving PDF sometimes. So make sure you've all files saved before running TS.
As an alternative, try #TASK (a free third party tool from a SW VAR and it's simply awesome)