AnsweredAssumed Answered

Changing Revisioning Components within a Workflow

Question asked by Dan Harlan on Feb 18, 2019
Latest reply on Mar 5, 2019 by Dan Harlan

PDM Pro 2016.

We have an existing workflow (I inherited) that ends up with 3 different release states (Release, Release for Build, Engineering Release). Release and Engineering Release we want to use an alpha scheme (A, B, C...), while Release For Build (RTB) we want to use numeric (1, 2, 3...).

 

It's not currently working as desired, plus I see various inconsistencies in the state and transition settings.

1) Is it possible to do this? Does it cause problems if/when a file goes from RTB rev 4 to Release rev A?

2) If you change the Revsion Numbers setup in an existing State or Tranisiton does it cause problems if the states/transitions have been used before?

Outcomes